  • Overhead Crane Case Studies 2-Ton Dock Loading Crane with Built in Fall Protection TSOC's staff of Structural mechanical engineers and our PE, designed, engineered, and manufactured, a two-function overhead crane and fall protection system built on one structure.

  • Overhead Crane Case Study

    The Challenge: To provide our customer, a leading trucking accessories supplier, with a complete design build of an under running 5 ton overhead crane system. The job incorporated the 5 ton overhead crane system and (2) ½ ton jib cranes. Special Considerations: The general contractor needed design build capabilities for the overhead crane and runway system. Crane-Tec provided complete design

  • Crane-Tec Overhead Crane Case Study 1. 10 Ton Freestanding Overhead Crane Case Study The Challenge: To provide our customer, a carpenters training facility, with a

  • Case Study 7: Overhead Crane Servicing and Maintenance A millwright is assigned to a servicing and maintenance task on an overhead crane. The employee initiates the prescribed energy control procedure by turning "off" the crane's electrical disconnect switch and placing his lock onto this energy isolating device.

  • The Challenge: To provide our customer, a major construction equipment dealer, with a building supported overhead crane system for a new facility in Kentucky. The job incorporated two 10 ton single girder overhead cranes. Special Consideration: The general contractor needed design build capabilities for the overhead crane and runway systems. Single girder overhead cranes with low headroom

  • Engineered drawings with loads were submitted for approval. Crane-Tec’s experienced field crew installed the complete system and overhead cranes in under 4 days, allowing the customer to use the equipment in the installation of new machinery. Overhead Crane Case Studies.

  • overhead crane case study
  • Overhead Crane & Lifting Equipment Case Studies

    Multi-Latching Crane Systems. RHC Lifting Limited, has completed the commissioning process of one of Europe’s most technically advanced crane systems at GKN Aerospace’s new wing composite manufacturing facility in Bristol, UK. The new manufacturing facility is to become a centre of excellence in composite aircraft wing structures. Learn more.

  • Overhead Crane Retrofitting – Case study. NASA’s SLS program requires the use of heavy lift cranes with very precise operation. Retrofitting the existing obsolete control system was a requirement for the support of this program. The existing crane was mechanically sound and originally designed to CMAA requirements.

  • Overhead Crane Case Studies 2-Ton Dock Loading Crane with Built in Fall Protection TSOC's staff of Structural mechanical engineers and our PE, designed, engineered, and manufactured, a two-function overhead crane and fall protection system built on one structure.

  • The Challenge: To provide our customer, a leading trucking accessories supplier, with a complete design build of an under running 5 ton overhead crane system. The job incorporated the 5 ton overhead crane system and (2) ½ ton jib cranes. Special Considerations: The general contractor needed design build capabilities for the overhead crane and runway system. Crane-Tec provided complete design

  • Crane-Tec Overhead Crane Case Study 1. 10 Ton Freestanding Overhead Crane Case Study The Challenge: To provide our customer, a carpenters training facility, with a

  • Case Study 7: Overhead Crane Servicing and Maintenance

    Case Study 7: Overhead Crane Servicing and Maintenance A millwright is assigned to a servicing and maintenance task on an overhead crane. The employee initiates the prescribed energy control procedure by turning "off" the crane's electrical disconnect switch and placing his lock onto this energy isolating device.

  • The Challenge: To provide our customer, a major construction equipment dealer, with a building supported overhead crane system for a new facility in Kentucky. The job incorporated two 10 ton single girder overhead cranes. Special Consideration: The general contractor needed design build capabilities for the overhead crane and runway systems. Single girder overhead cranes with low headroom

  • Engineered drawings with loads were submitted for approval. Crane-Tec’s experienced field crew installed the complete system and overhead cranes in under 4 days, allowing the customer to use the equipment in the installation of new machinery. Overhead Crane Case Studies.

  • Multi-Latching Crane Systems. RHC Lifting Limited, has completed the commissioning process of one of Europe’s most technically advanced crane systems at GKN Aerospace’s new wing composite manufacturing facility in Bristol, UK. The new manufacturing facility is to become a centre of excellence in composite aircraft wing structures. Learn more.

  • Overhead Crane Retrofitting – Case study. NASA’s SLS program requires the use of heavy lift cranes with very precise operation. Retrofitting the existing obsolete control system was a requirement for the support of this program. The existing crane was mechanically sound and originally designed to CMAA requirements.